Permanent Installation
2003
Proposition, permanent installation, St. Colombe sur l’Her, FR (2003)
A permanent intervention on an inactive aqueduct that was used to irrigate the surrounding fields. After the aqueduct lost its function, it became a dump.
The intervention proposes a possible former or future function of the site. The relaxing sound of a small waterfall makes the place a pleasant place to stay and the site became a meeting place.
Proposition
Permanent installation in public space, St. Colombe sur l’Hers, FR
Materials: White and blue tiles, cement.
Produced for Art & Nature, Centre d’Art Contemporaine, St. Colombe sur l’Hers, FR